WiFi & NETWORKING
-
-
Power strip PDU 19 ", 1U, 8 sockets, power: 16A, 4000W, aluminum, 2m
€26.35Delivery: 8-15 working days
-
-
PDU 19 "rack, 8 slots Type E, Schuko plug, 1.8m cable, aluminum switch
€24.28Delivery: 8-15 working days
-
-
-
-
-
-
-
-
Patch Panel 48 Ports 19 "'Cat.6 with cable management function black
€46.85Delivery: 8-15 working days
-
-
-
-
Panel krosowy (patch panel) modularny 19" 24 porty pod moduły keystone, 1U, ekranowany, prowadnica kabli, pola opisowe, szary
€17.32Delivery: 8-15 working days
-
Patch panel 19 "24 ports, CAT6, U / UTP, 1U, cable support, black (complete)
€35.62Delivery: 8-15 working days
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Three-phase electronic meter | energy consumption meter on DIN rail | 400V | LCD | 4P
€32.70Delivery: 8-15 working days
-
-
Pilot for pulling cables, fiberglass FRP, 8mm, 100m, yellow, without wheels
€179.83Delivery: 8-15 working days
-
Pilot for pulling cables, fiberglass FRP, 8mm, 50m, yellow, without wheels
€110.04Delivery: 8-15 working days
-
Pilot for pulling cables, fiberglass FRP, 4,5mm, 25m, yellow, without wheels
€50.75Delivery: 8-15 working days
-
Extralink Pilot 8mm 75m | Cable pulling rod | glass fibre FRP, d. 8mm, l. 75m, yellow
€151.16Delivery: 8-15 working days
-
-
-
-
-
-
-
-
-